37427
|
c2c Timetable scraped after only 3 weeksIn December 2006 c2c changed their timetable, I was informed by my dad that the new timetable lasted about 3 weeks, before c2c decided that they had make a major cock up; all their services were late, the overcrowding had become 3 times worse at peak times, and they eventually reverted back to the old timetable
My dad even picked up one of the new timetables so he could eventually sell it on ebay as "The railway timetable that lasted 3 weeks"
|